LifePoint Church had its beginning in an old store front
building with cinderblock walls and metal pipes overhead. It is like a
wide open warehouse. Because of its openness, the installation of
this equipment was one of the more convenient installations. You can see
that we installed a board, rack mount components and hanging speakers.
The challenge was the room. Cinderblock walls are not the best material
for audio signals. So, the design included sound proofing the room to
help eliminate the sound waves from bouncing off of the walls thus
caused a horrible worship experience for everyone. Once the room was
sound proofed, the audio engineer was able to perform the final tweeks
for the specific room.